Since installing the racks, we have been working on beautifying the area, the control room has carpet tiles installed and furniture delivered, air conditioning was plumbed in. Tomorrow we have glass around the control room being installed.
The pipework running the floor for the data center air handling units and chilled water system has started to be laid.